playdisplay▶ Book a call

Interactive exhibition stand

A stand people stop at — and stay at long enough for someone to talk to them.

At a trade fair you have three seconds while someone walks past. After that they have either stopped or not, and there will be no second chance that day. The job of a stand is not to look expensive. The job is to give a passer-by a reason to come over and a reason to stay long enough for your team to reach them.

A queue at the installation is the best metric a stand has. It is visible from the far end of the hall and works better than any signage.

What we build on stands

A complex product is sold by whoever lets you touch it

This is about industry, aviation, energy, rolling stock — anything where the product will not fit on a table. An exhibit that lets someone look inside an engine or assemble a train does half the sales conversation: the visitor asks the next question themselves, and that is a different conversation from “take a brochure”.

Schedule — the thing that decides everything at a fair

An opening date does not move. Our fastest turnkey interactive stand took three weeks, and it was not a one-off — three weeks from brief to a working exhibit in the hall has happened more than once. But that schedule means hard limits on scope: not everything imagined can be built in three weeks, and we say so before signing rather than after.

  1. Week one — scenario, mechanic, equipment specification, and ordering whatever has a long lead time.
  2. Week two — fabrication, development, content. In parallel, not in sequence.
  3. Week three — assembly, a full run-through, installation on site, tuning in place.
  4. Show days — being present on day one is not optional: a fair hall always behaves differently from a workshop.

What happens to the stand after the show

Usually nothing, and that is money thrown away. An exhibit designed for a second life travels to the next fair, moves into a sales office or into a corporate museum. It is decided at the engineering stage: demountability, transport cases, independence from one particular room. Slightly more expensive up front and noticeably cheaper per showing.

Who we have worked with

Rostec, United Engine Corporation, RSK MiG, Sinara Transport Machines, PTK Group, the Moscow City Government, BMW. Fairs: MAKS International Aviation and Space Salon, Rostec Expo, Moscow Urban Forum, Russia Expo.

How many people saw it

Projects where we have done this

Frequently asked questions

What is the minimum lead time for an interactive stand?

Three weeks is our real turnkey minimum, proven on several projects. It is possible when decisions are made quickly and the scope stays tight: one strong exhibit instead of five average ones.

Do you build the stand itself or only the interactive part?

Both ways. Often the structure is built by an exhibition contractor while we make the exhibits and the content — then it matters that we align at the layout stage, because an interactive object needs space, light, power and a viewing distance.

What if equipment does not arrive in time?

That is why equipment is ordered in week one and the scenario is written around what is actually available. We do not design a mechanic around a single instrument with a three-month lead time — that is experience, not caution.

Can an exhibit be reused at another fair?

Yes, if the engineering allows for it: demountability, cases, independence from a particular layout. Say so at the start — converting a finished exhibit for travel costs more than building it that way.

Book a 30-minute call →